Skip to main content
Home Home

Main navigation

  • Car Charging

    Car Charging

    Charging solutions for passenger vehicles across public and private applications.

    • High Power Public Charging (Split)

      Shared power at regional and urban locations, optimized for site economics.

    • High Power Public Charging (All‑in‑One)

      Dedicated power in a compact footprint at regional and urban locations.

    • Destination Charging

      Commercial DC charging aligned with driver dwell times.

    Car High Power Public Charging Topology
    • Peak Output
      8x 600 A
    • Dwell Time
      20-45 MIN
    • Utilization
      15-25 %
    • Maximized energy delivery per site
      Dynamic power sharing allocates capacity to deliver more total energy across all outlets.
    • Better lifetime site economics
      Higher utilization and reduced stranded capacity lower cost per delivered kWh.
    • Flexible growth with demand
      Scale outlets and capacity incrementally without duplicating full power stacks.
    All-in-one
    • Peak Output
      8x 600 A
    • Dwell Time
      20-45 MIN
    • Utilization
      15-25 %
    • Guaranteed power per charger
      Deliver predictable performance, independent of other chargers or site conditions.
    • Compact, self‑contained deployment
      Integrated power and dispenser minimize footprint where space or grid access is limited.
    • Fast, predictable site deployment
      Self‑contained chargers simplify installation and commissioning.
    Destination Charging
    • Peak Output
      4x 600 A
    • Dwell Time
      30-60 MIN
    • Utilization
      15-25 %
    • Fast charging at high-throughput locations
      Deliver rapid top ups during short dwell times.
    • Mid-speed charging at retail destinations
      Power and pricing are aligned to visit duration, driving repeat footfall.
    • Flexible charging across real estate
      Deploy charging as a scalable business across 
multi-site assets.
  • Truck Charging

    Truck Charging

    Charging solutions for light-, medium-, and heavy-duty vehicles across transport and logistics applications.

    • Ultra-High Power Public Charging

      Megawatt-level charging for long-haul truck transportation.

    • Depot Charging

      Energy-efficient opportunity, overnight and multi-modal charging for all fleets.

    Ultra High Power Public Charging Trucks
    • Peak Output
      2x 800 A

      1x 1500 A
    • Dwell Time
      25-45 MIN
    • Utilization
      20-25 %
    • Freight-grade uptime
      Ensure reliable turnaround and SLA performance during wave peaks.
    • MCS-ready, mixed fleet hubs
      Supports CCS and MCS today with a clear upgrade path to multi-megawatt charging.
    • Scale power under grid bottlenecks
      Modular site architectures enable outlet expansion and shared power without redesign.
    Depot Charging Trucks
    • Peak Output
      6x 250 A

      2x 800 A
    • Dwell Time
      15 MIN - 8 HRS
    • Utilization
      25-30 %
    • Opportunity charging
      Use loading and unloading windows to top up trucks.
    • Overnight charging
      Recharge trucks overnight using depot dwell time.
    • Multi-modal charging
      Use the same charging infrastructure for opportunity and overnight charging.
  • Bus Charging

    Bus Charging

    Heavy-duty charging solutions for depot and en-route public transit operations.

    • Depot Charging

      Reliable opportunity, overnight and multi-modal charging.

    • En-Route Charging

      Rapid pantograph charging at intermediate stops and endpoints.

    Depot Charging Bus Site
    • Peak Output
      4x 500 A
    • Dwell Time
      10 MIN - 7 HRS
    • Utilization
      25-30 %
    • Opportunity charging
      Use opportunity charging systems at intermediate stops and end-points.
    • Overnight charging
      Recharge buses overnight using depot dwell time.
    • Multi-Modal charging
      Use the same charging infrastructure for opportunity and overnight charging.
    En-Route Bus Site
    • Peak Output
      1000 A
    • Dwell Time
      5-45 MIN
    • Utilization
      25-30 %
    • Schedule-critical charging
      Energy infrastructure aligned to bus schedules and routes.
    • High-power top ups
      Deliver required energy reliably during short dwell windows.
    • Fail-proof conductive charging
      Designed for reliable alignment and easy maintenance.
  • Products & Services
    A400 Preview
    A200/300/400
    Ultra-Fast Charging Made Seamless
    C50
    C50
    Built to Power Places
    HVC360
    HVC360
    Distributed Power for Heavy-Duty Fleets
    HVC150
    HVC150
    Powering En-Route Bus Service
    OM M-Series Preview
    OM M-Series
    Modular Air-Cooled Power for Scalable Deployment
    OM Solo Front Preview
    OM Solo
    High-Power Single Outlet, Configured to Your Site
    Om Duo Preview
    OM Duo
    High-Power Dual Outlets, Configured to Your Site
    OM Dock Preview
    OM Dock
    Versatile Dispenser for all Depot Configurations
    OM Ultra Product Front
    OM Ultra
    Megawatt Charging for Long-Haul Logistics
    SERVICES
    Service Packages Support Spare Parts Management Certified Service Training
    SITE OPERATIONS
    Asset Management Energy Management
  • Search

Social Network Menü

  • LinkedIn
  • YouTube
Search
  • English
  • Français

Digital Services General Terms and Conditions

ABB E-mobility’s Digital Services General Terms and Conditions (DSGTC):

Digital Services General Terms and Conditions
English
pdf
Home Home

Footer

  • Industries
    • Public Charging
    • Public Transit
    • Transport & Logistics
    • Retail & Destination
  • Company
    • About us
    • Leadership
    • Sustainability
  • Stay connected
    • Newsroom
    • Contact us
    • Careers
© Copyright 2026 ABB E-mobility

Footer Meta Menu

  • Imprint
  • Legal

Social Network Menü

  • LinkedIn
  • YouTube